Client: International electrical company
Seat of the client: Germany
Period / duration of the contract: 2020
Content of the order:
- Simulation of the electric field strength distribution for protection against accidental arcing
- FEM model creation in NX Simcenter including dielectric material properties
- Model simplifications with regard to dielectric field calculations
- Use of the thermal-electrostatic analog, i.e. Using the Nastran Solution 153
- Comparison of variants to optimize the design